Article name BENCHMARK RISKS ANALYSIS OF NOT FULFILLING THE DESIGN PARAMETERS OF THE TECHNICAL AND ECONOMIC JUSTIFICATION OF THE FIELD DEVELOPMENT
Authors Goncharenko S.. ,
Bibliographic description
Category Earth science
DOI 622.22
DOI 10.21209/2227-9245-2022-28-1-6-18
Article type
Annotation The mine development project is a set of works, which, due to the uniqueness of mining and geological conditions, territorial location, climatic factors, lack of the necessary infrastructure, will be subject to a high degree of project risk. The aim of the work is to increase the implementation efficiency of the field development project based on a comparative analysis of the main technical and economic indicators with world industry leaders. Materials and methods. Based on the model of the mineral resources of the deposit and the comparative analysis carried out with a reference base with more than forty leading world deposits (benchmarking), a strategic analysis of the main technical, technological, organizational and economic parameters of open pit development has been carried out. The risk analysis, the input parameters used in the preliminary feasibility study of the project are adjusted and updated. The choice of the limiting open pit shell has been carried out, the problem of choosing the mining method and parameters of the equipment used has been solved, and the analysis of the optimal height of the open pit bench and the stages of development of technological blocks of the field have been carried out. Results. The obtained values of the main technical and economic indicators have formed the basis for the formation of a mining plan, as well as an assessment of operating and capital costs, taking into account risk factors. The following most significant risks are identified: availability of staff with relevant experience and competencies required to implement the mining plan; oxidation of long-term storage ore warehouses, which leads to a decrease in mineral extraction rates; high diesel and electricity costs. Conclusions. Based on the identified risk factors, capital and operating costs have been determined and adjusted for the level of energy consumption, the cost of drilling and blasting operations, control of the content of the useful component, loading, maintenance costs, labor costs and general costs
Key words Keywords: benchmark risk analysis; field model; preliminary technical and economic assessment; optimization of field development parameters; formation of a mining plan; selection of technological equipment; resource categories; capital intensity of the project; stages of development; rock mass movement
Article information Goncharenko S. Benchmark risks analysis of not fulfilling the design parameters of the technical and economic justification of the field development // Transbaikal State University Journal, 2022, vol. 28, no. 1, pp. 6-18.DOI: 10.21209/2227-9245-2022-28-1-6-18..
References 1. Berdaliyev B. A. Gorny informatsionno-analiticheskiy byulleten (Mining information and analytical bulletin), 2018, no. 2, рp. 208‒214. DOI: 10.25018/0236-1493-2018-2-0-208-214. 2. Bozhenyuk N. N. Neftyanoye khozyaystvo (Oil industry), 2015, no. 7, p. 72‒75. 3. Vorobiyev V. S., Petrov A. N. Geologiya, geofizika i razrabotka neftyanyh i gazovyh mestorozhdeniy (Geology, geophysics and development of oil and gas fields), 2017, no. 12, рp. 24–32. 4. Goncharenko S. N. Vestnik Sibirskogo gosudarstvennogo universiteta geosistem i tekhnologiy (Bulletin of the Siberian State University of Geosystems and Technologies), 2021, vol. 26, no. 3, рр. 71–86. DOI: 10.33764/2411-1759-2021-26-3-71-86. 5. Goncharenko S. N. Izvestiya vysshih uchebnyh zavedeniy. Povolzhskiy region. Tehnicheskiye nauki (News of higher educational institutions. Volga Region. Technical Sciences), 2021, no. 1, pp. 46‒62. DOI:10.21685/2072-3059-2021-1-5. 6. Goncharenko S. N. Izvestiya Tulskogo gosudarstvennogo universiteta. Tehnicheskiye nauki (Proceedings of the Tula State University. Technical science), 2021, no. 5, рр. 184-196. DOI: 10.24412/2071-6168-2021-5-184-197. 7. Kozlov V. V. Agafonov V. V. Ugol (Coal), 2017, no. 3, рр. 70–71. DOI: http://dx.doi.org/10.18796/0041-5790-2017-3-70-71. 8. Moldashi D. N. Gornyye nauki i tehnologii (Mining sciences and technologies), 2020, no. 5, рр.266‒284. https://doi.org/10.17073/2500-0632-2020-3-266-284. 9. Moldashi D. N. Programmnye produkty i sistemy (Software products and systems), 2020, no. 4. S. 689–696. DOI: 10.15827/0236-235X.132.689-696. 10. Podrezov D. R. Prikaspiyskiy zhurnal. Upravleniye i vysokiye tekhnologii (Caspian Journal. Management and High Technologies), 2020, no. 2, pp. 32‒43. DOI: 10.21672/2074-1707.2020.50.2.032-043. 11. Podrezov D. R. Vestnik Dagestanskogo gosudarstvennogo tekhnicheskogo universiteta. Tekhnicheskiye nauki (Bulletin of the Dagestan State Technical University. Technical science), 2020, no. 47, рр. 98‒107. DOI: 10.21822/2073-6185-2020-47-2-98-107. 12. Yakunchikov Ye. N., Agafonov V. V. Ugol (Coal), 2018, no. 9, рр. 64–69. DOI: http://dx.doi.org/10.18796/0041-5790-2018-9-64-69.
Full articleBENCHMARK RISKS ANALYSIS OF NOT FULFILLING THE DESIGN PARAMETERS OF THE TECHNICAL AND ECONOMIC JUSTIFICATION OF THE FIELD DEVELOPMENT